2019 Daly Ave Watermain Improvements - Hedley BC

Client: Village of Hedley
Related Links:

The Daly Ave Watermain Improvements project involved the replacement of an old 75mm cast iron watermain with a new 150mm PVC watermain.

2019 Oliver Capital Works 2019 - Oliver, BC

Client: Town of Oliver
Related Links:

For the 2019 Penticton Capital Works project, we upgraded many roads in Oliver. We worked on Fairview Rd, McGowan Drive, Crest-A-Way Road, Park Drive, and Airport Street. The upgrades vary, including new water services, dry wells, catch basins, paving stones, asphalt, concrete curb, and sidewalk.

2019 Renfrew Rd Repair and Storm Service Upgrades - Oliver, BC

Client: District of Peachland

The Renfrew Rd repair project consisted of installing a 15-inch perforated storm main, surrounded by drain rock and filter cloth, to collect groundwater and direct it to an appropriate location.  Following the pipework, we restored the road with new asphalt, ditching, and hydroseeding.

2019 Earle Crescent Reconstruction - Oliver, BC

Client: Town of Oliver
Related Links:

The Earle Crescent Reconstruction project consisted of regrading the roadway, adding curb, adjusting sidewalks and paving.  We also installed paving stones, new water services, storm dry wells, and catch basins.

2019 Area 27 Go Kart Track - Oliver, BC

Once in a while a project comes along that brings a smile to your face just talking about it. The Area 27 Go Kart Track is definitely one of them. The track was designed by Jacques Villeneuve and we take a lot of pride in building the 1.2 Kilometers track exactly how Jacques designed.

2019 Water Treatment Plant - Peachland, BC

Client: District of Peachland
Related Links:

The Peachland Water Treatment project is civil construction on a large scale. Deep excavations, large pipe and big equipment. We are working with Maple Reinders to bring the project to completion. The project consists of water main, storm main, electrical, natural gas, paving and sidewalks.

2019 Marriott Hotel - Penticton, BC

Client: Marriott Hotel
Related Links:

We worked as a subcontractor helping to build the 95 room Marriott Hotel. We provided excavating and trucking services to prep for the foundations. We then worked with plumbers and electricians to service the building. Once the building was started, we moved into the parking lot to connect the water, sewer and electrical to the City of Penticton main lines. The project will be finished off by installing street lighting, asphalt paving and landscaping.